Revenimiento a partir de 10 cm
Masa Unitaria de 1,600 a 1,900 kg/m3
Rango de resistencias especificables de 7 a 85 kg/cm2
Fraguado inicial de 4 a 8 horas
Fresh Concrete: Slump from 10 cm, compatible with auto compressible unit mass from 2.100 to 2.400 kg/m3. Initial setting 4 to 6 hours.
Hardened Concrete: Permeabilidad ion-cloruro controlada en cualquier rango de diseño (ASTM C-1202) Resistencia a la compresión a 28 días de 200 a 400 kg/cm2, chloride diffusion coefficients of the order of 3x10-9 to 1x10-8 cm2/s or 15-60 mm2/year. Decrease in the rate of attack by highly aggressive acids, characterization of each of the elements in the design to ensure control of any alkali-aggregate reaction.
Performance: Concrete performance specifications comply with the durability of different exposure described by the American Concrete Institute (ACI) and the Mexican Standards (NMX C-403 "Construction industry, hydraulic concrete for structural use")
Fresh concreteSlump Flows A, B and C (ASTM C1611)
Unitary mass of 2.100 to 2.400 kg/m3
Initial setting of 4 to 6 hours
Hardened ConcreteCompressive strength of 28 days from 150 kg/cm2
Fresh concrete: Slump 12, 14 and 18 cm, reduced bleeding, setting time of 5 to 8 hours .
Hardened Concrete: Flexural strength (MR) from 30 kg/cm2 to 50 in multiples of 5 kg/cm2 drying shrinkage of 400 to 800 millionths at 91 days of drying (NMX-C-173-ONNCCE)
Slump from 18 cm, auto compressible compatible
Unit mass of 2.100 to 2.400 kg/m3
Initial setting of 4 to 6 hours
Hardened ConcreteCompressive strength to 28 days from 200 kg/cm2
Initial setting of 4 to 6 hours
Fresh ConcreteSlump up to 18 cm unit weight of 2.100 to 2.400 kg/m3
Hardened ConcreteModulus of Rupture (MR) from 32 to 50 kg/cm2
Nonslip and reflective characteristics
El Concreto Trabajabilidad Controlada tiene una amplia utilización en casos constructivos específicos donde se requiera:
Concreto Fresco: Revenimiento a partir de 10 cm (mantiene el revenimiento especificado por períodos de tiempo controlado) .
Tiempos de estabilización: de 3, 5 y 8 horas desde que el concreto es suministrado en sitio.
Masa Unitaria de 2,100 a 2,400 kg/m3
Concreto Endurecido: Resistencia a la compresión a 28 días de 150 a 350 kg/cm2
Concreto de bajo peso volumétrico de 550 a 900 kg/m3. Estratégico para disminución de cargas en las estructuras puesto qué es un material más ligero.